Skip Ribbon Commands
Skip to main content
​  
   Covered school sites for CC22-0741-52 -Grp I/L include:                                                        PSA Specialist for this project is:
                                                                                                                                                     Maria Cruz   mcruz5@sandi.net  cell: (619) 879-7870​

Audubon Elementary School               8111 San Vicente St, San Diego, CA 92114

Freese Elementary School                  8140 Greenlawn Dr, San Diego, CA 92114
Nye Elementary School                      981 Valencia Pkwy, San Diego, CA 92114                            
Bid advertisement:     02/01/22

Pershing Middle School                       8204 San Carlos Dr, San Diego, CA 92119
Kumeyaay Elementary School             6475 Antigua Blvd, San Diego, CA 92124                           
Board Award:             04/12/22

Juarez Elementary School                   2633 Melbourne Dr, San Diego, CA 92123
Angier Elementary School                   8450 Hurlbut St, San Diego, CA 92123                               DIR PWCR#:           412042

  
  
  
  
collapse Document Types : Bid Documents ‎(3)
CC22-0741-52 Group I and L_FINAL Bid Tabulation.pdf
  
3/7/2022 12:26 PMPedregon Rey
LOA for Straight Line.pdf
  
3/7/2022 12:26 PMPedregon Rey
Straight Line Sub-Contractors.pdf
  
3/7/2022 12:27 PMPedregon Rey
collapse Document Types : Bid Spec's ‎(1)
Bid Specs_ F and I Fencing and SPOE Group I and Group L.pdf
  
4/12/2022 2:51 PMCruz Maria
collapse Document Types : LOA & SPJ (Post PJM) ‎(2)
NXTGEN Signs LOA and SPJ  (I - L).pdf
  
7/13/2022 4:49 PMCruz Maria
Premise Builders LOA and SPJ (I - L).pdf
  
6/22/2022 8:29 AMCruz Maria
collapse Document Types : Pre-Job LOA & SPJ (04/18/22) ‎(13)
All Time Fence LOA and SPJ (I - L).pdf
  
4/12/2022 2:34 PMCruz Maria
ASE Contracting LOA and SPJ (I - L).pdf
  
4/12/2022 2:35 PMCruz Maria
B and M Painting LOA and SPJ (I - L)(Rev).pdf
  
4/12/2022 2:43 PMCruz Maria
Buescher Electric LOA and SPJ (I - L)(Rev).pdf
  
4/12/2022 2:48 PMCruz Maria
Ferreira Construction LOA (I-L).pdf
  
4/14/2022 11:17 AMCruz Maria
Ferreira Construction SPJ only I and L (rev).pdf
  
4/12/2022 2:58 PMCruz Maria
GT Door LOA and SPJ (I - L).pdf
  
4/12/2022 2:36 PMCruz Maria
Makelele LOA and SPJ (I - L).pdf
  
4/12/2022 2:36 PMCruz Maria
Makelele SPJ I and L (rev).pdf
  
4/25/2022 10:19 AMCruz Maria
Straight Line GC-PJF (rev 2).pdf
  
4/25/2022 11:11 AMCruz Maria
Straight Line GC-PJF (rev 3).pdf
  
4/25/2022 11:33 AMCruz Maria
Straight Line GC-PJF (Rev).pdf
  
4/12/2022 3:14 PMCruz Maria
Tri City Glass LOA and SPJ (I - L) (Rev).pdf
  
4/12/2022 3:09 PMCruz Maria
collapse Document Types : Pre-Job Meeting Notes 04/18/22 ‎(1)
Pre-Job_F andI SPOE Fencing_Grp I-L and J-N meeting minutes.docx
  
4/18/2022 11:19 AMCruz Maria